Durchsuchen nach
Day: 14. Juli 2023

Caledonian Canal

Caledonian Canal

It took 24 hours to get the Swing Bridge working again. This we were told, is the usual time needed for repairs, still we were sooo relieved. We could move on to climb the 4 steps of the Muirtown looks. 25 more were to follow, all in all 29 locks and 11 swing bridges. From Clachnaharry lock where we entered into the canal up to Corpach it’s a stretch of 50 nm, a scenic trip from coast-to-coast through the Scottish…

Weiterlesen Weiterlesen

Translate »